The Starter Strip SV is an essential accessory in the installation of Novabrik siding. Its primary functions are:
- Foundation for the First Row: It provides a level and secure base for the first row of Novabrik, ensuring proper alignment and stability.
- Ventilation: The strip features a self-ventilated system with channels every 6 inches. This design helps to evacuate moisture that may accumulate behind the siding, preventing issues such as mold or rot.
Key Components
- Starter Strip SV: This is a perforated strip that is installed along the bottom of the wall where the Novabrik will be placed. It has built-in channels for ventilation.
- #8 x 2½” Screws: These screws are used to secure the Starter Strip SV to the wall. They are of adequate length to ensure a firm attachment.
Tips for Effective Installation
- Use a Level: Always use a level to ensure that the Starter Strip SV is perfectly horizontal. This is critical for achieving a professional and straight finish.
- Pre-Drill Holes: Pre-drilling pilot holes helps to prevent damage to the Starter Strip SV and makes the installation process smoother.
- Ventilation: Make sure that the ventilation channels are not blocked by debris or other obstructions to maintain proper moisture management.






